Sunday, May 30, 2021

One Monthly Goal - May's Goal Completed

 This month I had a two part goal to complete. You can see my goal setting here

Part one of this month's challenge was to sew three sections together to form a diamond. This was the easy part of the goal, so this was easily achieved.

My completed diamonds and laid out as the centre of my quilt.

Part two of this month's goal was to piece the next section of my Glacier Star. This part was more time consuming but I got there just in time. These sections will fit over the top of the diamonds.

I am very pleased how they came out. I am looking forward to the next section, which I managed to cut ready to sew.

I have linked my post with Elm Street Quilts post, so pop over and check out how everyone did this month.

Until Next Time

Keep Stitching

Cynthia

Friday, May 7, 2021

Missed it by that much

It's been a while since I had some sewing time. It has been busy with the Sewing Stitching & Handicraft Show, teaching and running the shop. 
So today I got a little session in with the ladies  for Friday Project Uninterrupted.  I have finished hand stitching the binding down on my 3 yard quilt and some new hand stitching will be needed. So I thought I would stitch on the binding on the one I finished quilting in April.
Now I have done this step many times over the years, so sometimes I get lazy and guess how many strips I need to bind a project. Today was one of those days and I missed it by this much.
As you can see it looks like I cut a bit off, which is exactly what I did. I cut a piece off for the label, as I  couldn't find a piece in the scrap box suitable.
So in the end I had to cut another strip to make up the shortfall to complete it. 
So now I have some more hand stitching for the evenings. Then I will be able to cross another project off my list.
Until Next Time
Keep Stitching
Cynthia

Wednesday, May 5, 2021

One Monthly Goal- May's Goal

 Things are crazy here and I want time to work on my unfinished projects but it is not working out for me. So I am set myself a goal that hopefully will be achievable in the sense I need to do it before the next workshop to stay ahead of my students. So far this year I have been doing ok with this one, so I am planning to keep it that way. 

So that plan for May is to join these sections together. 


That is an easy task I hear your say and yes it is, only 16 seams to sew. That is only part 1 of my plan. I also want to complete the next section which has two section in it.  It is the spikes that run along the joined sections.


So there is a bit of work in this month's goal. Though it was tempting to only set the first part for the month. That would have been really cheeky of me.

I have linked my post with Elm Street Quilts goal setting post, so pop over and check out what everyone is working on this month.

Until Next Time

Keep Stitching

Cynthia

Sunday, May 2, 2021

350 Block Report 2021- April's Report

 



This month's total is 30 blocks.

I started with 8 Diamond blocks for Glacier Star.


I created the wall hanging for our local RSL for Anzac Day. A total of 4.


19 house blocks for a group swap.

This month's total is 31.

This year's total is 279.

Until Next Time

Keep Stitching

Cynthia

One Monthly Goal- April's Goal Completed


 April was a blur. It started off busy and continued through the month, leaving me short on time to do much myself. I set myself  to finish quilting this quilt. You can see my goal setting post here.  It is two days in to the new month and I am only posted it now.

\



Now the month is coming to a close I can tell you I have finished the quilting all the way to the outside borders. I didn't get to binding it, but that is ok as I didn't think I would get there. The main aim was to finish quilting it, That job was done.

Some pictures of the back to show you the quilting in more details.

Until Next Time

Keep Stitching

Cynthia