Showing posts with label 2018 Finish Along. Show all posts
Showing posts with label 2018 Finish Along. Show all posts

Tuesday, July 10, 2018

2018- Finish Along Q3

It is time to set our project goals for the three quarter of the 2018 Finish Along. I have to say this may look familiar. The projects from last quarter are here topping the list.

Project #1 - I have my Hearts and Soul sampler quilt to complete. I want to say this is a sure bet as it has a deadline which is just before the end of the third quarter. It is ready for quilting. I have special plans for it using the Westalee Rulers.

Project #2 - Then we get to my Allietare quilt ready for pinning and quilting and the other left over from last quarter.

Project #3 - This table runner that has been missing for nearly 12 months. It is pinned ready for quilting. I may do this one first as I know what I am quilting on it already. I plan to use the Westalee honeycomb ruler on it.

Project #4 - This is where I may fall down a hole but the pile of quilting is growing. How I am not sure as I haven't ready had time to do much piecing but here is another one ready for quilting. This Water Garden Quilt needs quilting. Now I didn't pieced it my friend Shelly did and I said I would quilt, as she pieced it for me. So more Westalee ruler work planned for this one.

I have linked this post up with She Can Quilt link up post, so pop over and check out all the projects we are planning to work on.
Until Next Time
Keep Stitching
Cynthia

Wednesday, July 4, 2018

2018 Finish Along Quarter #2 Projects

It's time to report in on our finishes for this quarter. With limited sewing time over the last two month has only seen me finish one of my three projects this quarter.You can see my original post here.

I have managed to finished my Desert Sky quilt. Considering the other two projects on my list were ready for quilting and my Desert Sky still had work on the top to be done before it could be quilted, it's not the project I would have said at the beginner of the quarter it would be finished. It is finished and that is what counts. It can be crossed off the list and I can move on to something else.

I have linked this post to  Leanne's  post so pop over and see how everyone else did this quarter.

Until Next Time
Keep Stitching
Cynthia

Tuesday, April 10, 2018

2018 Finish Along Q2 Projects.

We have reach the second quarter of this year Finish Along. Now I have really looked hard for these projects, as time may be an issue with April and May being busy.

Only one from last quarter has made this list, that is my Allietare quilt which is ready for pinning and quilting since the beginning of the year.
 2. Is my Desert Sky quilt which is ready for borders than quilting.
 3. Is My Hearts and Soul panel quilt which is a large panel with a border around it. Simple enough when you need a very quick present. It is also ready for pinning and quilting.
I have select these project in hope that I can have a bit of production line sewing going on. Borders on my Desert Sky sewn on then a major pinning session followed the quilting. Leaving the binding to the end.
I have linked this post up with Leanne's post so pop over and check out what everyone is working on this quarter.
Until Next Time 
Keep Stitching
Cynthia

Sunday, April 1, 2018

2018 Finish Along Q1 Finish

We have reached the end of the first of 2018 Finish Along. Looking back on what I selected for this  quarter. Click Here to see the original post.  There was 3 projects I selected for this quarter and there was only one finish. That is this one.
My Framed Up Mystery quilt from last year. I suppose one finish is better than no finishes.  I will have to serious look at next quarters finishes as I am going to be flat out busy during April and May. I have linked this post up with She Can Quilts blog post, so don't be shy pop over and check out the finishes that did get completed. Plus it is tutorial week, you will want to check out. You may want to just us in the next quarter.
Until Next Time 
Keep Stitching
Cynthia

Sunday, January 7, 2018

2018 Finish Along Q1 Projects

It's the first quarter of the 2018 Finish Along. It is time to select our project for the first quarter. What to select from my long list of unfinished projects?
Do I select lots of projects to push myself or do I select 1-2 project s only?

Project #1.
 My Allietare quilt from 2015. I finally got the top together over my Christmas break so my plan is to quilt it and bind it in this quarter.
 Project #2 is a Scrappy quilt with these little blocks. Still more rows to go but the blocks are all under 4" in size so it wouldn't be a large project, she says. This one may take me a while.
Project #3 is my Framed Up quilt, it is currently off being quilted so when I get it back it will only need the binding done.
I have linked this post up with She can Quilt post so pop over and check out what everyone is working on or may join in.
Until Next Time
Keep Stitching
Cynthia