Monday, July 31, 2017

350 block Report 2017- July's Report


The target for this month is 29 blocks.

I am glad to say some sewing has happened this month.

24 blocks for the next stage of my Gypsy Wife quilt, blocks are done. Here comes the hard part sewing them all together.




I pulled out my Scrap Dance Tango project to finish so 2 more blocks for this one, but I need to look up the pattern as I am not sure if this layout is correct.


Two chubby Dresdens flowers that became a pin cushion for a workshop.
 

Borders went on a large wall hanging for 1 more.

Then some major assembling on the Gypsy Wife quilt I have counted each section I sew together as 1 toward my monthly total.
So 5 more as I have completed 5 sections 

One Round we go block

 Fingers crossed I can keep going during August with more sewing. 
So my total is 35 for this month.
Until Next Month
Keep Stitching
Cynthia

Sunday, July 30, 2017

Under the Pressure Foot #32

There are a few sewing jobs I need to do. Deadlines! Loaming over my head. I need to get on top of them before I sink. With a machine problem last week, I had to have my machine look at and it was returned to me on Friday. So with the other jobs done Saturday was my sewing day. Now I didn't have a whole day but a good 3/4 of the day.
Some work on this project. One block to make so I thought but now I am not sure if this is the correct layout or if I need to make more blocks.
The Gypsy Wife quilt was the other project I was working on.
It is starting to come together. The section I was working on.
I have now finished 5 sections so I am half way through the assembly.
Until Next Time
Keep Stitching
Cynthia

Tuesday, July 25, 2017

More Action on the Gypsy Wife Quilt

With all the blocks for the Gypsy Wife quilt made, it is time for sewing the quilt top together. In most cases this is a straight forward exercise. With the Gypsy Wife this is where it gets interesting.  Where to start? Section one is the logical starting point but it didn't look straight forward, so I started at Section 8. It is the need to start at a simpler section and the fact I like to work left to right. Sections 8, 9 and 10 which joins to the bottom of 8 and 9 looked a little easier then starting at 1 and 2 and is the left hand side of the quilt.

This is sections 8 and 9 with half of ten. It needs a good press.

This is where I got to as my sewing machine was playing up. Time to do something about that. I just wanted to finish this top off and I was going to have this machine serviced. She has decided she can't wait. So I will be quilting this weekend or I will change over my Pfaff back so I can piece. I have been using her mainly for quilting.
Until Next Time
Keep Stitching
Cynthia