First to be completed is the binding on my Dragon quilt before I can move on to the next binding job.
Then I got in to the next charity quilt binding.
Since I was on a binding roll I got stuck in to the next binding job.
There is 1 more ready to bind. Plus one more to baste, quilt and bind
I have linked my post with Elm Street Quilt post, so pop over and check out how everyone went this month.
Until Next Time
Keep Stitching
Cynthia
Thanks for linking up with Elm Street Quilts One Monthly Goal and congrats on your finish.
ReplyDelete