Well I had two projects that needed binding to complete them. See my original post here. An easy goal for October I thought, even though one of the projects is large.
The small one was completed but the second one had the binding sewn on ready for the hand sewing but I have not touched it since I did it.
Two things got in the way and threw me off my target. Though I have to admit I am easily distracted. The weather was the first thing we have had 2 weeks of extreme heat for October. Yes we are warming up, leading into Summer here in South Australia, but temperature around the 40 degree(100 + for my northern hemisphere readers) is a little much even for us. Who wants a large quilt on them when it is that warm.
The second reason was my Vintage Rose quilt has come back to me from being quilted, so I was distracted by it and decided I need to finish that one too.
It is huge too, so once again it was the last thing I wanted my lap.
So I think you will be seeing these two quilts again very soon.
I have linked my post with Elm Street Quilts, so pop over to see how everyone else went.
Until Next Time
Keep Stitching
Cynthia
That quilt is beautiful. Thanks for linking up with Elm Street Quilts One Monthly Goal.
ReplyDeleteooh, looks lovely Cynthia :)
ReplyDeleteWhat a pretty distraction! I'd want to get this one finished as well!
ReplyDelete