I had to look back to my original post to remind myself what I had set myself as I could only remember the dresden plate table runner which I have not completed I did applique the circles on but I have been stuck on the border fabrics.
Project #3 on the list is ready for quilting but I have misplaced it since I used it as a sample project at the July fair. I was sure it would turn up when I did the Tanunda Fair thinking it was stashed in one of the craft fair boxes but I was wrong. Now I am worried what has happened to it.
Considering all the projects were small projects you would of thought I would have completed more than 1 from the list but no, not me. I have managed to side track myself and only completed 1 project. In 2018 I think I will be selecting 1 or 2 projects in hope that something more may get completed. My success rate on completing projects and crossing them off my list during 2017 has be poor.
With that all said there was one project completed and it was the little sample table runner for our Round We Go Block of the Month in a different colourway. I was finishing the quilting at the start of Quarter 4.
So here it is completed.
I have linked up with She Can Quilts so pop over and see how everyone else did with their finishes.
Until Next Time
Keep Stitching
Cynthia
Completing one project is a great achievement!! It looks beautiful, so thanks for sharing and inspiring!!
ReplyDeleteNice, did you quilt it on a frame, or a domestic machine?
ReplyDeleteThis is a lovely finish - well done! Thanks for taking part in the FAL - from the FAL hosts!
ReplyDelete